HRC and CRC lead times for the week ending September 30 remained at 2.9 and 5.4 weeks respectively, flat from 13 and 11-week lows in the previous week.
HDG lead times rose to 6.0 weeks from a 17-week low of 5.4 in the week prior.
Sources: The Steel Index, Steel Business Briefing
HRC = Hot Rolled Coil CRC = Cold Rolled Coil HDG = Hot Dipped Galvanized




